 Kalinga Project AfterEnd result was a stunning ensuite renovation, meeting the client brief. |  Spring Hill ProjectSpring Hill Workers Cottage, extensive renovation project currently under construction. Retaining heritage features where possible. Kitchen Design, Ensuite/Master Bedroom Design, Dining Room, Living Area Designs x2, Bathroom, Powder Room, Laundry, Office, Outdoor Living Room |  WallpaperWallpaper Installation |
---|
 Ascot ProjectRenovations were completed in 2 stages, stage 1 comprised of redesign of Master bedroom, Ensuite & Walk in Robe, redesign of Main Bathroom, carpet installation, interior & exterior plantation shutters installed, interior colourscheme.
Stage 2 involved removal, relocation & design of a new kitchen, redesign of powder room & laundry, redesign of entry, installation of interior & exterior plantation shutters, interior colourscheme.
All design work & Project Management by Interior Solutions Brisbane |  Ascot ProjectThe existing timber gates were replaced with black exterior shutters |  Ascot ProjectExisting front door was replace, including the installation of floor to ceiling louvers increasing the light in the front foyer |
---|
 Bulimba Project - Before Back of house prior to extension, pool & landscaping |  Bulimba projectAfter extensive renovation project, which included exterior/interior colour scheme, internal access garage, guest bedroom & ensuite, powder room, laundry & living space downstairs. Upstairs included renovation of existing main bathroom, bedrooms with the addition of a walk-in robe & ensuite in the master bedroom, new extension at the rear of the existing house included living, dining, kitchen with butlers pantry flowing out to outdoor living/ding area with an outdoor kitchen & swimming pool. |  Bulimba Project - AfterRear extension |
---|